SWITCH CASE STUDIES

PROJECT COMPARISON
2x TowerCrane (no grid connection was available)
BY IMPLEMENTING THE P-GRID RXL ON THIS PROJECT SWITCH MANAGED TO:
•Reduced on site noise
•Minimised exhaust fumes
•Reduced CO2 emissions by 254.9tons
•Implamented a cost saving of $109,173pa
•Offered potential carbon credit incentives

PROJECT COMPARISON
2x TowerCrane (with a 32amp grid supply)
BY IMPLEMENTING THE P-GRID RXL ON THIS PROJECT SWITCH MANAGED TO:
• Reduced on site noise
• Minimised exhaust fumes
• Reduced CO2 emissions by 396 tons
• Implemented a cost saving of $196,746 pa
• Offered potential carbon credit incentives