PROJECT COMPARISON 2x TowerCrane

2x Terex CTL 260-18t Each Tower CraneMax Draw200amps.
Each crane commonly serviced by a 250kVa Traditional Generator.

 Comparison Basis
 230 working days per year 7am –5pm Avr. Working day (10hrs)
Fuel price $2.01 (1/05/24)
2.7kgs CO2 per litre of diesel 
 320kWh usage per day
Average 12 month project
 No Grid connection available
Grid price per KWH $0.24 (1/05/24)
Generator Type Traditional Diesel Generator 
P-Grid RXL Running Off 
Internal Genset 
Gross Output 250kVa 320/480kVa
Fuel Take Capacity  200L 200L
Fuel Consumption 24.2L/h 10.5L/h
Total Running Time (per day) 10hrs 7hrs
Total Running Hours (per year) 2,300 1,610hrs
Total Fuel Consumption (per year) 55,660 16,905
Total Fuel Cost (per year) $111,876 $33,979
Hire Cost (per year) $49,400 $179,400
CO2 Emissions (per year) 150,282tons 45.6tons
Cost (per year) $332,552 $213,379

 


BY IMPLEMENTING THE SWITCH P-GRID RXL ON THIS PROJECT:

• Cost saving of $109,173pa

• Reduce CO2 emissions by 254.9tons

• No grid power connection required on site 

• On site noise reduction

• Minimize exhaust fumes

• Potential carbon credit incentives

WE HERE AT SWITCH POWER SOLUTIONS ARE COMMITTED TO SWITCHING YOU TO A MORE EFFICIENT, COST EFFECTIVE AND SUSTAINABLE POWER SOLUTION.

REQUEST A QUOTE

Leave your details below and one of our helpful team members will be in touch to discuss your requirements and provide you with more detailed information aligned to your business needs.

Contact form

GET IN TOUCH

If you want to speak with one of our experienced switch team members, please feel free to call or email us directly.

CONTACT US

P: 0416 348 529
E: info@switchps.com

We look forward to hearing more about you and your business needs.